- ID rural-bank-starter-kit, version 1
- Institution type BPR
Evaluation flow
- Calculations (active)
- Knock-out rules (active)
- Scorecard (active)
- Decision matrix (active)
- Pricing and amount (active)
- Approval authority (active)
- The initial assessment runs the calculations and knock-outs that apply. The final assessment runs all active steps.
Calculations
active
- C01 Penghasilan bersih — Net income = Income used − Monthly expenses. Result in rupiah, stage initial and final assessment.
- C02 Rasio angsuran terhadap penghasilan — DSR (installment-to-income ratio) = (Installment from the request + Current installments) ÷ Income used. Result in basis points, stage initial and final assessment.
- Rounded half-up to a multiple of 10 basis points.
- C03 Rasio angsuran terhadap penghasilan bersih — Repayment capacity = Installment from the request ÷ Net income. Result in basis points, stage initial and final assessment.
- Applies if Net income ≠ IDR 0.
- Rounded half-up to a multiple of 10 basis points.
- C04 Rasio pinjaman terhadap agunan — Loan-to-collateral ratio = Requested amount ÷ Collateral value. Result in basis points, stage initial and final assessment.
- Applies if Has collateral is yes.
- Rounded half-up to a multiple of 10 basis points.
Knock-out rules
active
- K01 Format NIK tidak valid (active). Stage initial and final assessment, all products.
- Reject if all conditions is met. NIK format valid is no.
- K02 Usia belum mencapai 21 tahun (active). Stage initial and final assessment, all products.
- Reject if all conditions is met. Age (years) < 21.
- K03 Usia saat lunas melebihi 65 tahun (active). Stage initial and final assessment, all products.
- Reject if all conditions is met. Age at maturity > 780 months.
- K04 Terdaftar dalam Daftar Hitam Nasional (active). Stage initial and final assessment, all products.
- Reject if all conditions is met. National blacklist match is yes.
- K05 Nama cocok dengan hasil pemeriksaan APU-PPT atau DTTOT (active). Stage initial and final assessment, all products.
- Reject if all conditions is met. APU-PPT or DTTOT match is yes.
- K06 Terdaftar dalam daftar hitam internal (active). Stage initial and final assessment, all products.
- Reject if all conditions is met. Internal blacklist match is yes.
- K07 Kolektibilitas SLIK 3 sampai 5 (active). Stage initial and final assessment, all products.
- Reject if all conditions is met. SLIK repayment status (1–5) ≥ 3.
- K08 Kolektibilitas SLIK 2 (active). Stage initial and final assessment, all products.
- Refer if all conditions is met. SLIK repayment status (1–5) = 2.
- K09 Masih ada pengajuan aktif (active). Stage initial and final assessment, all products.
- Refer if all conditions is met. Another active request exists is yes.
- K10 Penghasilan bersih tidak positif (active). Stage initial and final assessment, all products.
- Reject if all conditions is met. Net income ≤ IDR 0.
- K20 Pinjaman melebihi 80% nilai agunan (active). Stage initial and final assessment, all products.
- Refer if all conditions is met. Has collateral is yes and Loan-to-collateral ratio > 80%.
Scorecard
active
- Base points 0.
- S01 Usia (Age (years)).
- Below 25 → 4 points.
- From 25 and Below 35 → 8 points.
- From 35 and Below 50 → 12 points.
- From 50 → 8 points.
- Missing data needs review.
- S02 Lama usaha (Business age (years)).
- Below 1 → 2 points.
- From 1 and Below 3 → 7 points.
- From 3 and Below 7 → 12 points.
- From 7 → 16 points.
- Missing data needs review.
- S03 Kepemilikan rumah (Home ownership).
- Owned → 12 points.
- Family → 7 points.
- Rented → 3 points.
- Missing data needs review.
- S04 Jumlah tanggungan (Dependents).
- Below 3 → 8 points.
- From 3 and Below 5 → 5 points.
- From 5 → 2 points.
- Missing data gets 4 fallback points.
- S05 Rasio angsuran (DSR (installment-to-income ratio)).
- Below 20% → 18 points.
- From 20% and Below 30% → 13 points.
- From 30% and Below 40% → 7 points.
- From 40% → 0 points.
- Missing data needs review.
- S06 Riwayat SLIK (SLIK repayment status (1–5)).
- Below 2 → 16 points.
- From 2 and Below 3 → 5 points.
- From 3 → 0 points.
- Missing data needs review.
- S07 Agunan (Has collateral).
- Yes → 10 points.
- No → 2 points.
- Missing data gets 0 fallback points.
- Grade A starts at 72 points.
- Grade B starts at 58 points.
- Grade C starts at 45 points.
- Grade D starts at 32 points.
- Grade E starts at 0 points.
Decision matrix
active
Columns by DSR (installment-to-income ratio).
| Grade | Below 30% | From 30%, below 40% | From 40%, below 50% | From 50% |
|---|---|---|---|---|
| A | Approve | Approve | Refer | Reject |
| B | Approve | Approve | Refer | Reject |
| C | Approve | Refer | Reject | Reject |
| D | Refer | Refer | Reject | Reject |
| E | Reject | Reject | Reject | Reject |
A provisional grade, a grade missing from the matrix, or an empty column value triggers a Refer decision.
Pricing and amount
active
- Fallback — an addition to or reduction from the product base interest per year of 0%. Amount 100% of the product limit.
- Grade A — an addition to or reduction from the product base interest per year of -1%. Amount 100% of the product limit.
- Grade B — an addition to or reduction from the product base interest per year of 0%. Amount 90% of the product limit.
- Grade C — an addition to or reduction from the product base interest per year of +1%. Amount 70% of the product limit.
- Grade D — an addition to or reduction from the product base interest per year of +2%. Amount 50% of the product limit.
- Grade E — an addition to or reduction from the product base interest per year of +3%. Amount 0% of the product limit.
Approval authority
active
- Up to IDR 50,000,000 — role Manager.
- Up to IDR 250,000,000 — role Credit committee.
- Up to IDR 5,000,000,000 — role Board of directors.
- The last row is the highest level.
- A referral moves up one level when available.